Project Manager: Kyle Rutherford -
kdr32@drexel.edu
QA/QC Manager: Joe Seybert -
jrs72@drexel.edu
Construction Manager: Jeff Bade -
jeb632@drexel.edu
Engineering Manager: Kyle Jones -
kbj32@drexel.edu
Competition Manager: Greg Scott -
gs592@drexel.edu
Administrative Manager: Liz Holly -
eah47@drexel.edu
Update: 11/19/07
The first of our test pours I'm told went very well. The mixing
procedure went incredibly smoothly. Dr. Moon's lecture was also
very useful and informative. The lecture was recorded and his
notes are also available.
Previous Mtg. Details: 1 hr lecture w/ 8 in attendance, 3 hrs w/ 4 in
attendance
Next Mtg. Date: Tuesday, November 20, 2007, 6pm-9pm
Next Mtg. Topic: Mixing batches 2-4
Update: 11/14/07
It has been a while since the last update, so this will be all
inclusive of the past month and a half. Mix designs are well into
development. We have 3 mix designs in the works now with 3 more to
be used next week. Thus far, all three mixes are lighter then
water thanks to our new aggregate (perlite) - this means no floatation
tanks and a boat weight of roughly 150-175 lbs. On the
construction end of things, I have been in talks with Boeing Corporation
regarding mold fabrication. If all goes well, they will be a HUGE
help in the development of the molds. If they are unable to
perform the services, we are going to have to bite the bullet and build
them ourselves in a similar fashion as last year. Dr. Moon has
also graciously offered his help on the structural analysis and has also
agreed to come speak at the meeting this Thursday. Several new
links have also been posted to the Education portion of this site.
Previous Mtg. Details: 3 hrs w/ 5 in attendance (11/13/07) - batching
and cleaning
Next Mtg. Date(s): Thursday, November 15, 2007, 5pm-8pm
Next Mtg. Topic: Structural Analysis Lecture and Mixing our first 3
batches.
Update: 9/30/07
At the last meeting we discussed some of the various things that need
to get started for the year. We have many materials order for the
Concrete and we divvied up some of the other various tasks. Liz
will be handling Fundraising in the next week or so, Greg will be
looking to talk to some of the classes about recruitment, Practices have
commenced, and Greg and Peter will be looking into some Fiberglass
places for mold research. Liz and Michelle will also be looking
into various aggregates. If you are interested in helping in any
of these, please speak up.
Previous Mtg. Details: 1 hr w/ 8 in attendance
Next Mtg. Date(s): Tuesday, October 2nd, 6pm-8pm ~ Thursday (if
necessary) October 4th, 5:30pm-8pm
Next Mtg. Topic: Review of progress, Clean up *this is essential as we
have been informed that our area is in need of cleaning, and may be
shared from time to time.*
Update: 9/23/07
Welcome back to school!
Next Mtg. Date: Tuesday, September 25, 6pm-7:30pm
Next Mtg. Topic: Fundraising, Recruitment, Construction/Molds, Theme,
Display, NCCC Rules
Update: 9/11/07
Rules and Regulations released today. A PDF version is posted
at the bottom of the "Education" Page.
Update: 8/6/07
A wall mural has been started down in the lab. We took some of
the old nostalgic stuff that was lying around and hung them up on the
wall. It looks decent, but will improve with more stuff acquired.
We still need people to make some phone calls, we're kind of at a stand
still until then.
Previous Mtg. Details: 1.5 hrs w/ 4 in attendance
Next Mtg. Date: TBD
Next Mtg. Topic: Secondary Test pour, Mixing/materials details
Update: 7/29/07
The forum has been created and linked on all the pages. You'll
need to sign up to post anything and we would really like to see this
used as a primary means of team communication. A calendar is also
built into the forum where we will post meetings, milestones, and other
important dated information.
Update: 7/25/07
Test mold for the potential pouring method was a success. Some
further testing will be required, but initial results are incredibly
promising (Further detail will be explained at upcoming meetings).
Materials for the Concrete are being looked at this week by a few people
who are specifically interested in Concrete Development. If you
are interested in this and did not receive an email from Kyle Jones,
email him and inform him of your interest. Likewise for
construction. If you are interested, email Jeff.
Previous Mtg. Details: 1.5 hrs w/ 4 in attendance
Next Mtg. Date: Tuesday, July 31, 6pm-8pm
Mtg. Topic: General Mtg., Wall Mural.
Update: 7/18/07
Education Page updated with topics to be posted as completed.
If any topics are missing or you would like to see one added, please
contact a manager. Managers Mtg. resulted in several projected
deadlines to be met including a test pour next week for feasibility
purposes, material acquisition for mixing by August 1st, preliminary mix
designs prepared by August 7th with testing beginning by August 14th.
Additionally, a lead contact for Fiberglass production is projected to
be completed by the 14th as well. A preliminary pour date in Early
November is optimal.
Previous Mtg. Details: 2 hrs w/ 6 in attendance
Next Mtg. Date: Wednesday, July 25th 6pm-8pm
Mtg. Topic: General Mtg. regarding current business and test pour.
Update: 07/14/07
Website Created
|